- Periodic Review
- Definitions and Applicability
- References
-
Section 1.1 Generator Interconnection Process: Markets and Operations Phase
-
Section 1.2 Generator Commercial Naming Convention
-
Section 2.1 Generation Owners' Responsibilities
-
Section 2.2 Transfers of a Generation Facility and Name Changes of Generation Owners and Project Developers
-
Section 2.2.2 Generation Owner or Project Developer Name and/or contact information Changes
-
Section 3.2.4 Control Center Staffing Requirements
-
Section 4.3.4 Data Exchange and Management Requirements
-
Section 5.1.3 PJM Reserve Markets
-
Section 5.4.2 The Day-ahead Energy Market
-
Section 5.7.2.8
-
Section 6.3.3 Test Energy
-
Section 7.1.2 Voltage and Reactive Control
-
Section 7.3: Critical Information and Reporting Requirements
-
Section 7.3.6: Periodic Task Document Periodic Review
-
Section 7.5.2 Generation Resource Preparation and Cold Weather Checklist
-
Section 13.1 Marketing and Classification of Mixed Technology Facilities
-
Section 13.2: Other Requirements
-
Attachment A: New Generator Checklist
-
Attachment D: PJM Generating Unit Reactive Capability Curve Specification and Reporting Procedures
-
Attachment E: PJM Generator and Synchronous Condenser Reactive Capability Testing
-
Attachment N: Cold Weather Checklist
-
Added additional winter preparation guidance for combustion turbine intake preparation based on NERC Lessons Learned
-
Add additional guidance applicable to inverter-based resources
-
Added other best practices based on industry events
-
- Appendix A: Behind the Meter Generation Business Rules
-
Clarified reference wording for metering requirements
-
Removed statement requiring BTMG generation to modeled in the PJM EMS in order for telemetry and metering to be communicated to PJM
-
Removed outdated reference to Manual 3A, Appendix D
-
Modified instances of Interconnection Customer to Project Developer
-
Included references to GIA in final agreements
-
- Updated reference from M14A/M14G to new M14H