Non-Retail Behind the Meter Generation Business Rules

The NRBTMG business rules were established by Settlement Agreement (EL05-127)2 in 2005, before the implementation of the Reliability Pricing Model and Capacity Performance (CP), and before the integration of American Transmission Systems, Inc. (ATSI), Duke Energy Ohio & Duke Energy Kentucky (DEOK), and East Kentucky Power Cooperative (EKPC). Since the establishment of the rules, there have been minimal updates to reported NRBTMG MW values, no instance when a NRBTM generator was evaluated for operational performance, and increases in installation of Distributed Energy Resources that may have the total NRBTMG MW value approaching the 3,000 MW cap established by the Settlement Agreement. As a result, there are clarifications in the performance and reporting requirements of NRBTM generators that are needed to ensure all parties, such as PJM, NRBTMG owners and operators, EDCs, municipal electric systems, and electric cooperatives, understand and are able to perform their responsibilities. As per the Settlement Agreement, there is also a need to determine, once the cap is reached, if the business rules, including the cap, need to change.

Proposed Timeline

Issue initiated: 3.5.2019
Work begins: 4.9.2019
Target Completion: TBD
Actual Completion: 8.12.2021

Issue Details

Stakeholder Body Operating Committee
Facilitator Souder, David W.
Subject Matter Expert Esterly, Theresa
OC Approval Date 8.6.2019
MRC Approval Date 9.26.2019
Problem Statement/
Issue Charge First Read
1.8.2019
Issue Catalyst PJM Interconnection
Issue Status Closed
Manual Changes Yes
  • Stakeholder Process Step

  • Completed Approved
  • Completed Education
  • Completed Interest
  • Completed Design
  • Completed Options
  • Completed Packages
  • Completed Consensus
  • Completed Review
  • Completed Completed